Since our last update on this work, a lot has happened. Although the final floors are still being installed, the project has already left a clear mark on the skyline.
A layer of Liquid Rubber HBS200 is applied with a brush between all the connections of the precast concrete elements. This is followed by Geotextile to bridge the connection. The second layer of Liquid Rubber HBS200 is applied over the Geotextile. All window frames, cill and floor connections are also sealed with Liquid Rubber.