Liquid Rubber HBS200 has been applied around the pre-framed openings. All connection joints of the concrete elements, both horizontal and vertical, have been provided with an airtight layer using the airless spray system. The balcony connections have also been made airtight. Due to the scale of the project, the decision was made to spray Liquid Rubber HBS200 using an airless system to enable higher daily productivity.